THOM

Building Engineering Envelope

Engineering First. Products Second.

One panel. Every function. Zero trades. We didn't reinvent the wall to be different — we removed every cost you're already paying.

IP Protection In ProgressEngineered in EnglandAluminium-LedFlat-Pack Modular

A new class of modular construction technology

The Product

One Panel.
Every Function.

Five trades. Five materials. Five schedules. Replaced by a single engineered panel — flat-packed to site, assembled in hours.

R50 Thermal (Target)
Fire Validation in Progress
RF Shielded (Testing)
Rapid assembly target · field validation pending
Recyclable aluminium · system lifecycle validation pending
Acoustic Shield (Testing)
Brick · Timber · Steel · SIPsOne THOM Panel
The Panel

Built in Layers.

Built for Everything.

Every function that used to require a separate trade — engineered into one panel at the factory.

Outer Aluminium Skin
Aluminium-led outer envelope — system fire classification pending
L6
Thermal Insulation Core
R50 Thermal Target
L5
Pre-Routed Services Channel
Zero Secondary Trades
L4
RF / EMF Shielding Layer
Faraday Shielding (Testing)
L3
Acoustic Dampening Layer
Acoustic Shield (Testing)
L2
Inner Finish Surface
Ready to Use — No Plaster
L1
5 trades · 5 materials · 5 schedules1 panel · 1 trade · 1 line item
Factory-engineered · Patent-pending · Assembled on-site
02 — The Insight

One Envelope. Every Function.

Every wall system is a stack of trades. We didn't improve the stack — we replaced it.

01

One Panel Replaces All of Them

Brick, timber, steel, SIPs — every wall is a stack of trades. We replaced the stack.

02

Five Trades Become One

Bricklayers, carpenters, welders, insulators, plasterers — gone. One panel. One trade. One line item.

03

Engineered, Not Assembled

Services pre-routed. T-slots throughout. No drilling, no chasing, no coordination.

04

Deploy Anywhere

Flat-pack to anywhere on earth. Unskilled team. Days, not months. No infrastructure needed.

03 — The Problem

Construction is Broken.

The costs you're absorbing right now. The line items THOM eliminates.

6–18months on programme

Slow Construction

Brick needs months of wet trades. Timber needs drying time. Steel needs fabrication. US: ~4M home deficit (Freddie Mac). UK: 300K homes/year target. You carry the cost.

98%of megaprojects over budget

Cost Overruns

McKinsey: 98% of megaprojects overrun by 30%+. Flyvbjerg: average 28% overrun across 16,000+ projects. The line items you can't control.

0days lost per phase

Weather Dependency

Brick can't be laid in frost. Timber warps in damp. THOM has no wet trades.

~70kg CO₂/m²

Embodied Carbon

Brick cavity walls emit c. 70 kg CO₂/m². Timber rots. Steel is energy-intensive. None survive your ESG targets.

439KUS workers needed (2025)

Coordination Risk

ABC: US construction must attract 439,000 new workers in 2025. UK faces a growing trades shortfall. Five trades to coordinate. Five things that don't show up.

Materialrecovery pathway

End-of-Life Design

Aluminium is recyclable as a material; THOM is designed around recovery and reuse, with whole-system lifecycle validation pending.

Five trades. One panel. Every cost above disappears.

04 — The Proof

Engineered for Partners & Operators

R50 Thermal (Target)

Design target — whole-panel validation pending. Outperforms brick, timber, steel, and SIPs. Steel thermal-bridges — THOM doesn't.

Partner: Designed to exceed regulatory targets with zero insulation trades.

Operator: Designed to cut data centre cooling loads. US and UK housing code-compliant by design.

Acoustic Shield (Testing Underway)

Timber transmits sound. THOM is designed to block it — acoustic validation programme in progress.

Partner: Designed for acoustic compliance in one panel — not a separate contract.

Operator: Designed for secure comms rooms. Confidential briefing spaces. No secondary fit-out.

Fire Validation in Progress

Reaction-to-fire and fire-resistance programmes are in progress; no achieved classification is claimed.

Partner: A defined accredited validation route is being progressed.

Operator: Project-specific fire requirements must be confirmed against validated evidence before specification.

RF & EMF Shielding (Testing Underway)

RF/EM shielding is designed into the panel architecture rather than assumed as an achieved result.

Partner: Designed to support high-performance RF/EM applications without specialist linings — validation pending against the required standard.

Operator: Designed for secure-facility RF/EM applications — validation pending against the relevant project and regulatory requirements.

Rapid Assembly Target

Flat-pack, mechanically assembled and designed to reduce wet-trade dependency. Comparative installation speed remains subject to controlled field evidence.

Partner: Designed to reduce site overhead and weather dependency; realised programme effects remain subject to project and field evidence.

Operator: Designed for rapid deployment scenarios, including defence and remote applications; actual programme duration remains subject to field validation and project requirements.

Recyclable Aluminium Architecture

Aluminium is recyclable as a material and THOM is designed for component recovery; whole-system lifecycle outcomes remain subject to validation.

Partner: Potential circular-economy and embodied-carbon benefits, subject to lifecycle evidence.

Operator: Designed to support circular procurement and material recovery; end-of-life outcomes remain project- and evidence-dependent.

07 — The Numbers

Installed Cost Per m²

Like-for-like: installed price per m² of wall area (supply + installation). THOM commands a premium on raw installed cost — the next slide shows where the real economics live.

THOMTraditional Brick & BlockTimber FrameSteel FrameKingspan QuadCore IMP£0£95£190£285£380
Speed
Days, not months
No wet trades, reduced scaffolding
Weather
Year-round build
Minimal weather dependency
Circularity
Designed for reuse
Aluminium-led circular design; fire validation separate

THOM & competitor pricing: governed published pricing sources (installed, per m² wall area, UK basis). Empirical benchmarks: BAS Frames UK SFS Guide 2026 (£140–£320/m² through-wall); US Design Estimation 2026 ($12–$40/sq ft). Confirm against current project specifications.

08 — The Real Cost

Total Cost of Ownership

Reference: 120m² wall area · £800/day site overhead. Installed cost (supply + install) + site overhead during construction = total build cost.

THOMTraditional Brick & BlockTimber FrameSteel FrameKingspan QuadCore IMP£0k£15k£30k£45k£60k
  • Installed Cost
  • Site Overhead
Speed
Daysvs Weeks–Months

No wet trades. No fabrication lead times.

Weather Risk
Near-Zerovs 3–7 days/phase

Year-round build. Minimal dependency.

Secondary Trades
Zerovs 5+ trades

One panel. One trade. One line item.

Circularity
Designed for reusevs Low–High

Aluminium can be recycled repeatedly as a material. THOM whole-system recovery and lifecycle outcomes remain subject to validation. Competitor percentages are external benchmark inputs and should be read in their stated source context.

Raw installed cost is where the conversation starts — speed and overhead are where THOM wins.

THOM & competitor pricing: governed published pricing sources (installed, per m² wall area, UK basis). Empirical benchmarks: BAS Frames UK SFS Guide 2026 (£140–£320/m² through-wall); US Design Estimation 2026 ($12–$40/sq ft). Confirm against current project specifications.

Housing & Residential

The end of brick & block.

× THE PROBLEM

UK: 300,000 homes a year needed. US: ~4 million home deficit (Freddie Mac, 2024). A trades shortfall growing on both sides of the Atlantic. Brick and block can't close the gap.

⚡ THOM'S ANSWER

Flat-pack, weather-tight in days, finished in weeks — not months. No bricklayers. No plasterers. No weather dependency.

Validation
Pending
Installation evidence programme in progress
Thermal Target
c. R50
Whole-panel validation pending

*Cost comparison based on installed pricing per m² wall area (supply + installation).

Data Centres

Thermal failure is not an option.

× THE PROBLEM

The US is the world's largest data centre market — $300B investment announced (2024–2028), 66 GW under construction in North America (JLL). Steel thermal-bridges. Timber can't meet fire compliance. Brick is too slow.

⚡ THOM'S ANSWER

Target c. R50 thermal performance, subject to validation. Modular service integration and flat-pack deployment are design objectives; installation timing must be proven through field validation.

Thermal Target
c. R50
Whole-panel validation pending
Fire Status
Validation pending
Reaction-to-fire programme in progress

*Cost comparison based on installed pricing per m² wall area (supply + installation).

Portable & Deployable

Go anywhere. Build anything.

× THE PROBLEM

From FEMA disaster relief to DoD forward operating bases — brick, timber, steel, SIPs are all impossible in the field. No infrastructure. No trades. No second chances.

⚡ THOM'S ANSWER

Flat-pack to anywhere. No specialist tools. No heavy machinery. Small team. Standard ISO unit in under a day.

Assembly
Rapid target
Field validation pending for standard ISO unit
Tooling
Minimal
No specialist tools required

*Cost comparison based on installed pricing per m² wall area (supply + installation).

Container Studio

Beyond the shipping container.

× THE PROBLEM

Containers thermal-fail, transmit sound, and corrode. Conversion doesn't fix the fundamentals — it masks them.

⚡ THOM'S ANSWER

Same ISO-footprint concept with target c. R50 thermal performance and integrated-service intent. Fire performance and installation duration remain subject to validation.

Thermal Target
c. R50
Whole-panel validation pending
Assembly
Rapid target
Field validation pending for standard ISO format

*Cost comparison based on installed pricing per m² wall area (supply + installation).

THOM14 — The Future

Build the Future with THOM

You've seen the numbers. You know the pain. The question isn't whether the industry changes — it's whether you're building with the system that changes it. Here's the scale we're building toward.

0
continents targeted

UK and GCC active today. US market entry underway. One system, global reach.

50,000
units

Housing, data centres, defence, and storage worldwide.

2M
m² deployed

Aluminium replacing brick, timber, steel, and SIPs.

£500M
in value

From patent-pending prototype to global platform.

Technical Partnership

Full technical transfer of the THOM BEE system. Specifications, assembly training, and ongoing engineering support for your projects.

Direct Supply

THOM manufactures and supplies panels directly to your development. Flat-pack delivery, on-site assembly support, and quality assurance.

IP Protection In Progress · Engineered in England · © 2026 THOM Inc.

01 / 13